• "slidebg1" data-bgposition="right center" data-kenburns="on" data-duration="14000" data-ease="Linear.easeNone" data-bgfit="100" data-bgfitend="110" data-bgpositionend="left center"

    LBUSD Early College Academic and Technical School #1

    Long Beach, CA

  • "Background Image"
PROJECT INFO

Designed to serve about 1,000 students, the 150,000 square foot high school has 43 classrooms in seven buildings surrounding a campus promenade. The thematic curriculum provides an innovative program introducing 9th – 12th grade students to academic and technical experiences.

The administration building/library, science building, two multi-story classroom buildings, gymnasium, lecture hall and food services facility all have high-tech, energy efficient and flexible features to support student learning and success.

Pan-Pacific installed domestic water systems, as well as waste and storm systems. Key sustainable components of this project included reclaimed water for campus irrigation, high-efficiency plumbing fixtures to conserve water, and storm water allowed to percolate into the play fields for groundwater regeneration instead of directly entering the public storm drain system.