• "slidebg1" data-bgposition="right center" data-kenburns="on" data-duration="14000" data-ease="Linear.easeNone" data-bgfit="100" data-bgfitend="110" data-bgpositionend="left center"

    Marin General Hospital

    Greenbrae, CA

PROJECT INFO

The New Marin General Hospital will serve as the center for quality healthcare in Marin County. Projected to open in 2020, this new hospital will have 171 patient rooms, 6 new operating rooms, 13 operating/procedure rooms, and 3 rooftop gardens. It will be 260,00 square feet and the design and construction team is striving to achieve LEED Certification, with a storm water capture and treatment system, water-efficient landscaping and the use of green construction materials.

Pan-Pacific performed Fuel Oil work at the hospital installing a 12 foot, 35,000 gallon underground storage tank. The fuel scope included monitoring, filter units, Master Control Panel and day tanks. Installed in a very narrow area which required coordination and effort to install safely.